WORLDS OF FUN | 04.12.14


Let's check in on the new SteelHawk. Like how they centered the ride with the fountain.



The ride still has a lot of work to be done before it can open to the public. Right now they're doing wiring for the ride and the LED lighting package.



The white structures will hold the shade awnings for the queue area. The railings are for the queue area.



It appears that all of the LED lighting tubes have been installed. The structure is the control booth.



These blue railings are for the outside fence around the ride.



There is a lot of open land now around the ride. It will be interesting to see how this land is utilized.



The ride towers over the rest of the park. As of now, it is scheduled for a July opening.


RETURN TO WORLDS OF FUN UPDATES