WORLDS OF FUN'S PATRIOT | CONSTRUCTION REPORT 03.10.06
Even with the stormy weather in the KC metro area
today, the PATRIOT site was a happenin' place.
This cement mixer was onsite for quite awhile. My
question is what do they need concrete for out that
far away from the site.
There is a pile of blue tubes sitting over by the fence.
I think there will be used for drainage.
Lookie there! There are water dummies in one of
the trains... wonder what those are for?!?!
A worker up on the storage area.
On the other side of the station, the entrance (small building
with roof) and the queue line gates have been installed.
Looks like we are going to do some testing! The train has made
its way around the corner to the station. Also you can see the
roof of the entrance to the queue line a little better.
Off we go! Into the WILD blue yonder.
Almost to the top.
Down the First Drop!!!
Here we go into the last little pop of the circuit.
Floater hill over the station -- that looks like a lot of fun.
Finally the inclined curve. This part of the ride really FLEW!!!